[{ "name": "Ad - Medium Rectangle CC01 - 300x250", "id": "AdMediumRectangleCC01300x250", "class": "inlineCenter", "insertPoint": "8", "component": "2963441", "requiredCountToDisplay": "12" },{ "name": "Ad - Medium Rectangle LC01 - 300x250", "id": "AdMediumRectangleCC01300x250", "class": "inlineCenter", "insertPoint": "18", "component": "2963441", "requiredCountToDisplay": "22" },{ "name": "Ad - Medium Rectangle LC09 - 300x250", "id": "AdMediumRectangleLC09300x250", "class": "inlineCenter", "insertPoint": "28", "component": "3252660", "requiredCountToDisplay": "32" }]
We have a new street in front of our house on Trouville Avenue, Grover Beach.
Thanks to:
• The Grover Beach City Council for placing a bond measure for street repair on the ballot.
• Voters of Grover Beach who approved bond Measure K-14 that will generate $48 million for street repair over a 25-year period.
• Grover Beach City staff for managing and overseeing the planning, design and construction.
• Rick Engineering for design services.
• JJ Construction for excavation, grading, and paving.
We hope the city will now consider a way to better maintain and keep our new streets clean with an improved and more frequent street sweeping schedule.
Richard and Carol Roberts
Grover Beach